{"id":25492,"date":"2026-01-21T15:14:49","date_gmt":"2026-01-21T13:14:49","guid":{"rendered":"https:\/\/www.aerotim.ro\/?p=25492"},"modified":"2026-09-21T15:37:48","modified_gmt":"2026-09-21T12:37:48","slug":"comunicat-de-presa-semnare-contract-de-finantare-parc-fotovoltaic-7mw","status":"publish","type":"post","link":"https:\/\/www.aerotim.ro\/index.php\/2026\/01\/21\/comunicat-de-presa-semnare-contract-de-finantare-parc-fotovoltaic-7mw\/","title":{"rendered":"Comunicat de presa &#8211; Semnare contract de finantare PARC FOTOVOLTAIC 7MW"},"content":{"rendered":"<p style=\"text-align: right;\"><a href=\"https:\/\/www.aerotim.ro\/wp-content\/uploads\/2026\/01\/cofinantat-UE.png\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-26240 size-full\" src=\"https:\/\/www.aerotim.ro\/wp-content\/uploads\/2026\/01\/cofinantat-UE.png\" alt=\"\" width=\"1000\" height=\"151\" srcset=\"https:\/\/www.aerotim.ro\/wp-content\/uploads\/2026\/01\/cofinantat-UE.png 1000w, https:\/\/www.aerotim.ro\/wp-content\/uploads\/2026\/01\/cofinantat-UE-300x45.png 300w, https:\/\/www.aerotim.ro\/wp-content\/uploads\/2026\/01\/cofinantat-UE-768x116.png 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><\/p>\n<p style=\"text-align: right;\">Data: 21.01.2026<\/p>\n<h4 style=\"text-align: center;\"><strong>\u00a0<\/strong><strong>Comunicat de pres\u0103<\/strong><\/h4>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>\u201eParc Fotovoltaic 7 MW (PF7MW)\u201d, cod SMIS 350331<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Proiect cofinan\u021bat prin Fondul pentru Modernizare, <\/strong><strong><em>Programul-cheie 9: Eficien\u021b\u0103 energetic\u0103 \u00een transporturi &#8211; reducerea emisiilor de CO<\/em><\/strong><em>_<\/em><strong><em>2 prin eficien\u021b\u0103 energetic\u0103 \u0219i noi tehnologii \u00een transporturi<\/em><\/strong><strong>.<\/strong><\/p>\n<p><strong>\u00a0<\/strong><strong>Denumirea<\/strong><strong> proiectului:<\/strong><\/p>\n<p><strong>\u201eParc Fotovoltaic 7 MW (PF7MW)\u201d, cod SMIS 350331<\/strong>, cofinan\u021bat prin Fondul pentru Modernizare, <em>Programul-cheie 9: Eficien\u021b\u0103 energetic\u0103 \u00een transporturi &#8211; reducerea emisiilor de CO_2 prin eficien\u021b\u0103 energetic\u0103 \u0219i noi tehnologii \u00een transporturi<\/em>.<\/p>\n<p><strong>Titlu Apel:<\/strong> Sprijinirea investi\u021biilor \u00een noi capacit\u0103\u021bi de producere a energiei electrice produs\u0103 din surse regenerabile pentru autoconsumul aerodromurilor, inclusiv sisteme de stocare a energiei.<\/p>\n<p><strong>Beneficiar:<\/strong> Societatea Na\u021bional\u0103 \u201eAeroportul Interna\u021bional Timi\u0219oara -Traian Vuia-\u201d S.A.<\/p>\n<p><strong>Valoarea total\u0103: <\/strong><\/p>\n<p>68.564.153,98 lei (TVA inclus), din care 39.446.904,14 lei reprezint\u0103 cofinan\u021barea eligibil\u0103 din Fondul pentru Modernizare, iar diferen\u021ba de 29.117.249,84 lei este asigurat\u0103 din surse proprii ale Aeroportului, acoperind cheltuielile neeligibile \u0219i TVA-ul aferent acestora.<\/p>\n<p><strong>Localizarea proiectului:<\/strong><\/p>\n<p>Obiectivul de investi\u021bii va fi implementat \u00een intravilanul localit\u0103\u021bii Ghiroda, jude\u021bul Timi\u0219, pe terenul identificat prin CF nr. 405691, cu o suprafa\u021b\u0103 de 99.644 m\u00b2. Terenul este \u00eencadrat \u00een categoria de folosin\u021b\u0103 cur\u021bi-construc\u021bii \u0219i este destinat realiz\u0103rii unui parc fotovoltaic cu sistem de stocare a energiei (CEF + BESS). Amplasamentul se afl\u0103 \u00een vecin\u0103tatea Aeroportului Interna\u021bional Timi\u0219oara \u2013 Traian Vuia. Terenul este proprietatea Statului Rom\u00e2n \u0219i se afl\u0103 \u00een concesiunea Aeroportului pentru o perioad\u0103 de 49 de ani.<\/p>\n<p><strong>Componentele investi\u021bionale:<\/strong><\/p>\n<ul>\n<li>Aproximativ 10.368 de panouri fotovoltaice monocristaline, cu o putere total\u0103 instalat\u0103 de 6,5 MW.<\/li>\n<li>Sistem de stocare a energiei electrice de 10 MW (BESS).<\/li>\n<li>Sistem de pompe de c\u0103ldur\u0103, pentru acoperirea aproximativ 20% din necesarul de energie termic\u0103 al terminalului.<\/li>\n<\/ul>\n<p><strong>Activit\u0103\u021bile principale ale proiectului:<\/strong><\/p>\n<ul>\n<li>Achizi\u021bia instala\u021biilor \u0219i echipamentelor necesare pentru produc\u021bia \u0219i stocarea energiei electrice din surse regenerabile.<\/li>\n<li>Lucr\u0103ri de construc\u021bii \u0219i montaj pentru punerea \u00een func\u021biune a unit\u0103\u021bii de produc\u021bie \u0219i stocare a energiei electrice.<\/li>\n<li>Captarea energiei solare \u0219i transformarea acesteia \u00een energie electric\u0103 utilizabil\u0103, cu regularizarea curentului alternativ la standarde.<\/li>\n<li>Consumul energiei produse \u00een regim de autoconsum \u0219i reglarea dezechilibrelor prin sistemul de stocare.<\/li>\n<li>Colectarea datelor pentru evalu\u0103ri suplimentare ale poten\u021bialului energetic.<\/li>\n<\/ul>\n<p><strong>\u00a0<\/strong><strong>Obiectivul general al proiectului:<\/strong><\/p>\n<p>Sprijinirea tranzi\u021biei verzi \u0219i cre\u0219terea autonomiei energetice a infrastructurii aeroportuare prin realizarea unei investi\u021bii \u00een capacit\u0103\u021bi noi de producere a energiei electrice din surse regenerabile (tehnologie fotovoltaic\u0103), \u00eempreun\u0103 cu sisteme de stocare a energiei, dedicate exclusiv autoconsumului \u00een cadrul perimetrului aerodromului, \u00een vederea reducerii consumului din surse conven\u021bionale, a emisiilor de CO\u2082 \u0219i a cre\u0219terii autonomiei energetice.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Indicatori de realizare \u0219i de rezultat:<\/strong><\/p>\n<p><strong><u>Indicator de realizare:<\/u><\/strong><\/p>\n<ol>\n<li><strong>Economii \u00een consumul anual de energie primar\u0103<\/strong><br \/>\nUnitate de m\u0103sur\u0103: MWh<br \/>\n\u021aint\u0103: 239,750<\/li>\n<\/ol>\n<p><strong><u>Indicatori de rezultat:<\/u><\/strong><\/p>\n<ol>\n<li><strong>Cre\u0219terea capacit\u0103\u021bii de producere a energiei verzi, \u00een vederea atingerii obiectivelor din Planul Na\u021bional Integrat \u00een domeniul Energiei \u0219i Schimb\u0103rilor Climatice 2021-2030 (MW)<\/strong><\/li>\n<\/ol>\n<p>Unitate de m\u0103sur\u0103: MW<br \/>\n\u021aint\u0103: 6,500<\/p>\n<ol start=\"2\">\n<li><strong>Reducerea emisiilor de gaze cu efect de ser\u0103 (tone echiv CO2)<\/strong><br \/>\nUnitate de m\u0103sur\u0103: tone CO\u2082<br \/>\n\u021aint\u0103: 618,570<\/li>\n<li><strong>Capacitate nou instalat\u0103 de stocarea energiei din surse regenerabile solar, \u00een vederea atingerii obiectivelor din Planul Na\u021bional Integrat \u00een domeniul Energiei \u0219i Schimb\u0103rilor Climatice 2021- 2030 (MWh)<\/strong><br \/>\nUnitate de m\u0103sur\u0103: MWh<br \/>\n\u021aint\u0103: 10,000<\/li>\n<li><strong>Produc\u0163ia medie de energie din surse regenerabile (MWh\/an)<\/strong><br \/>\nUnitate de m\u0103sur\u0103: MWh<br \/>\n\u021aint\u0103: 547,920<\/li>\n<\/ol>\n<p><strong>\u00a0<\/strong><strong style=\"font-size: 16px;\">Produc\u021bia total\u0103 de energie din surse regenerabile pentru perioada de referin\u021b\u0103 (MWh)<\/strong><\/p>\n<ol start=\"5\">\n<li>Unitate de m\u0103sur\u0103: MWh<br \/>\n\u021aint\u0103: 958,400<\/li>\n<li><strong>Procentul din produc\u021bia total\u0103 de energie din surse regenerabile estimat a fi folosit pentru consumul propriu (%)<\/strong><\/li>\n<\/ol>\n<p>Unitate de m\u0103sur\u0103: %<br \/>\n\u021aint\u0103: 70,320<\/p>\n<ol start=\"7\">\n<li><strong>Factorul de capacitate al centralei (%)<\/strong><br \/>\nUnitate de m\u0103sur\u0103: %<br \/>\n\u021aint\u0103: 13,250<\/li>\n<li><strong>Energia absorbit\u0103 anual de instala\u021bia de stocare, de cel pu\u021bin 75 % din instala\u021bia de produc\u021bie de energie din surse regenerabile la care este conectat\u0103 direct (%)<\/strong><br \/>\nUnitate de m\u0103sur\u0103: %<br \/>\n\u021aint\u0103: 80,000<\/li>\n<li><strong>Reducerea gazelor cu efect de ser\u0103: sc\u0103derea anual\u0103 estimat\u0103 a gazelor cu efect de ser\u0103 ca urmare a utiliz\u0103rii energiei stocate pentru activit\u0103\u021bile \u00eentreprinse \u00een aeroport pe timp de noapte (Echivalent tone de CO2\/an)<\/strong><br \/>\nUnitate de m\u0103sur\u0103: tone CO\u2082<br \/>\n\u021aint\u0103: 624,040<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>Date de contact pentru diferite observa\u021bii\/\u00eentreb\u0103ri \u00een leg\u0103tura cu implementarea proiectului:<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Beneficiar<\/strong>: S.N. Aeroportul Interna\u021bional Timi\u0219oara \u201eTraian Vuia\u201d S.A.<\/p>\n<p style=\"text-align: center;\"><strong>e-mail<\/strong>: <a href=\"mailto:office@aerotim.ro\">office@aerotim.ro<\/a> ; <a href=\"mailto:relatii.publice@aerotim.ro\">relatii.publice@aerotim.ro<\/a><\/p>\n<p style=\"text-align: center;\"><strong>tel<\/strong>: +40 256 386 089<\/p>\n<p style=\"text-align: center;\">\u201cCofinan\u021bat prin Fondul pentru Modernizare\u201d<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.aerotim.ro\/wp-content\/uploads\/2026\/01\/Proiecte-FM-logo2.png\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-25482\" src=\"https:\/\/www.aerotim.ro\/wp-content\/uploads\/2026\/01\/Proiecte-FM-logo2.png\" alt=\"\" width=\"545\" height=\"63\" srcset=\"https:\/\/www.aerotim.ro\/wp-content\/uploads\/2026\/01\/Proiecte-FM-logo2.png 545w, https:\/\/www.aerotim.ro\/wp-content\/uploads\/2026\/01\/Proiecte-FM-logo2-300x35.png 300w\" sizes=\"auto, (max-width: 545px) 100vw, 545px\" \/><\/a><\/p>\n<p><strong>Mai multe informatii pe pagina la sectiunea Proiecte<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Data: 21.01.2026 \u00a0Comunicat de pres\u0103 &nbsp; \u201eParc Fotovoltaic 7 MW (PF7MW)\u201d, cod SMIS 350331 Proiect cofinan\u021bat prin Fondul pentru Modernizare, Programul-cheie 9: Eficien\u021b\u0103 energetic\u0103 \u00een transporturi &#8211; reducerea emisiilor de CO_2 prin eficien\u021b\u0103 energetic\u0103 \u0219i noi tehnologii \u00een transporturi. \u00a0Denumirea proiectului: \u201eParc Fotovoltaic 7 MW (PF7MW)\u201d, cod SMIS 350331, cofinan\u021bat prin Fondul pentru Modernizare, Programul-cheie [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":25501,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[56,154],"tags":[],"class_list":["post-25492","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aeroport","category-business"],"_links":{"self":[{"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/posts\/25492","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/comments?post=25492"}],"version-history":[{"count":7,"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/posts\/25492\/revisions"}],"predecessor-version":[{"id":26243,"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/posts\/25492\/revisions\/26243"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/media\/25501"}],"wp:attachment":[{"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/media?parent=25492"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/categories?post=25492"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aerotim.ro\/index.php\/wp-json\/wp\/v2\/tags?post=25492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}